Customer
Name
|
|
Customer
Application
|
Customer
Request(s)
|
Switch
/ Prox Type
|
Similar
Product
|
Contact
Name
|
Phone
|
E-Mail
*Required |
Fax
|
Shipping
Address
|
Mailing
Address
|
Annual
Sales Quantity
|
Target
Price Range
|
Desired
Delivery Date
|
Advertising
Source
|
Sales
Desk
|
|
1.
What are your operational requirements? Is the switching device
to be a proximity sensor or reed switch?
What condition triggers operation and release? Form A SPST normally open,
Form B SPST normally closed,
Form C SPDT, BSL? |
Operational
Requirements
Proximity Sensor
Pull In/Operate Condition
Drop Out/Release Condition
|
Reed Switch
Pull In/Operate Condition
Drop Out/Release Condition
|
Other
|
Actuator
Requirements
|
Life
Cycles
|
Frequency
|
| 2.
What are your electrical requirements? What is the current, voltage,
and/or power to be switched? Is the circuit inductive, resistive or capacitive
in nature? How quickly must the switching device complete the switching
operation? Do you have voltage holdoff, insulation resistance or contact
resistance requirements? |
Electrical
Requirements
Switching Voltage Range
|
Operate / Release Time
|
Switching
Current Range
|
Switching
Power Range
|
Insulation
Resistance
|
Load
Type
Resistive
Inductive
Capacitive
|
Voltage
Holdoff
|
Contact
Resistance
|
| 3.
What are the physical requirements? What is the maximum size?
How will you mount the switching device in to the application? Are there
wires or connectors to attach the switching device to the rest of the
circuit? |
Physical
Characteristics
Centerline / Lead Bend
|
Existing CS
|
Orientation
/ Mounting
|
Overall
Length
|
Housing
/ Wire / Connector / Epoxy
|
|
| 4.
Will you have any drawings relating to this project (application,
housing, schematic)? Will you provide any materials? Will you
do anything between receiving the switch and inserting it into the application? |
Customer
Involvement
Agreed CFS Date
|
Actual CFS Date
|
Testing
/ Modification
|
Provided
Parts / Fixtures
|
Drawings
(App., Housing)
|
Drawings
Received
|
Send
Non-Disclosure to
|
Date
Sent
|
| 5.
What is the operating environment for the switch device?
Operating/Storage temperature? Surrounding ferrous materials? Additional
magnetic, electrical, or RF fields? Vibration? G-forces? Shock? Acceleration? |
Environmental
Issues
Operating/Storage Temperature
|
Other
|
| 6.
Are there any additional requirements? UL listing? Quality? Packagaing?
Shipping? Testing? |
Additional
Requirements
|
Notes
|
| |
|
Initiator
|
Submittal
Date
|
Sales
Liaison
|
Review
Date
|
Product
Development
|
Received
Date
|
Agreed
Completion Date
|
Actual
Completion Date
|
|
|